SalMar Follafoss 2 was developed as a continuation and expansion of the existing Follafoss facility. The project increased production capacity and built upon established production solutions, focusing on efficient operations and stable production conditions.
Client: SalMar
Location: Follafoss, Trøndelag
Delivered: 2019
Production type: Turnkey smolt facility
Capacity: 6 million pre-smolt from 5 to 40 g
Building area: 3,000 m²
The Delivery
- Expansion of the existing RAS facility
- New production departments
- Integrated water treatment
- Automation and process control
Facility Features
- Further development of the existing facility
- Salinity 0–3 ‰
- Increased production capacity
- Efficient integration with existing infrastructure
Key Figures
- 6 million pre-smolt per year
- 5.3 tons of feed per day
- 2 RAS sections
- 18 tanks
- 4,800 m³ tank volume
