Back to project references Project reference

MOWI Sandøra

MBBR MOWI Sandøra

MOWI Sandøra was developed for the production of smolt and post-smolt in a modern RAS facility with a high degree of automation. The facility is designed to combine high production capacity with efficient operations, good water quality, and stable production conditions.

Client: MOWI
Location: Nordland
Delivered: 2020
Production type: Smolt and post-smolt facility
Building area: 7,440 m²

The Delivery

  • Complete RAS facility
  • Modern water treatment systems
  • Automated process solutions
  • Monitoring and control
  • Integrated production infrastructure

Key Features of the Facility

  • High degree of automation
  • Developed for large-scale production
  • Efficient operation and resource utilization
  • Focus on stable production conditions

Key Figures

  • 10.3 tonnes of feed per day
  • 4 RAS departments
  • 24 tanks
  • 13,120 m³ tank volume