Osland 2 was developed as an extension of the existing Osland facility to increase production capacity and enable the production of larger post-smolt. The project builds on experiences from Osland 1 and combines efficient land use with modern RAS technology and a high degree of process control.
Client: Osland
Location: Bjordal, Vestland
Delivered: 2019
Production type: Post-smolt facility
Capacity: 2.5 million post-smolt from 100 to 200–400 g
Building area: 2,200 m²
The Delivery
- Expansion of existing production facility
- New RAS departments
- Increased water treatment capacity
- New production lines
- Automation and process monitoring
Facility Features
- Further development of existing production
- Increased capacity for larger fish
- Efficient integration with existing infrastructure
- Optimized operations and resource utilization
Key Figures
- 2.5 million post-smolt per year
- 4.6 tonnes of feed per day
- 2 RAS departments
- 6 tanks
- 6,000 m³ tank volume